The project envisaged measures comprise of the following components:
• Construction of a mechanical-biological wastewater treatment plant for a nominal treatment capacity of 80,000 people equivalents (PE), including sewage sludge treatment and disposal (with particular focus and under consideration of latest energy efficiency standards and technologies);
• Extension and rehabilitation of sewerage network and main collectors;
• Integrated urban development of Zenica comprising a bike lane along river Bosna.
Requested Consultant Services:
The PIU/PEA is seeking to engage a qualified consultant to perform the following services for the implementation of water supply and wastewater disposal systems:
• Overall management of the project
• Detailed design, tendering
• Construction supervision
• Assistance to the PEA during Defects Notification Period
• Accompanying measures for support of the PEA and PUC (Public Utility Company ViK Zenica)
Bezugsquelle für Unterlagen:
Mr. Stefan Meschke
Am Kranen 6
DE 96049 Bamberg
E-Mail : [email protected]